Worked example: estimating charging power

At an illustrative 14 V charging voltage, a 30 A DC-to-DC output provides roughly 420 W before losses. Charging a depleted 2.0 kWh battery bank would therefore take more than 4.8 hours at that output, because charger efficiency, tapering, temperature and competing loads all affect actual time. Use the DC-to-DC Charger & Alternator Planner to explore system assumptions.

FAQ: Is a 100 A alternator safe for a 100 A charger? Not necessarily. The alternator also supports engine loads, and continuous hot output can be much lower than the nameplate rating. Confirm available continuous current, manufacturer limits, protection strategy, and lithium/BMS compatibility with a qualified marine electrician.

Why alternator protection matters with lithium

LiFePO4 batteries can accept high charging current for extended periods. An alternator designed around lead-acid charging may overheat if asked to deliver its nominal output continuously. An abrupt BMS disconnection can also create voltage transients in unsuitable charging arrangements. A DC-to-DC charger controls current and voltage between the engine charging system and house bank; other installations use externally regulated alternators with temperature sensing and BMS integration.

How to enter the alternator data

The rated alternator output is a manufacturer rating, not a promise of continuous output at idle. Enter a conservative assumed sustainable-output percentage based on actual measurement and manufacturer data. Subtract engine electrical and other DC loads that need power while the engine is running. Choose the alternator-side input voltage and actual house-bank charge voltage, which may differ.

Calculating charger output

Available input power ≈ (sustainable alternator amps minus reserved loads) × input voltage. Estimated DC-to-DC output current = available input power × efficiency ÷ house charge voltage, limited by the charger’s output-current rating. The calculator displays which of those limits governs. A charging-time estimate uses the watt-hours to replace divided by effective charger output power and an entered average-output factor.

Worked example

A 120A alternator assumed capable of 65% sustained output provides 78A before loads. Reserving 25A leaves 53A. At 14V input and 90% converter efficiency, available house-charge power is about 668W; at 14.2V charging voltage that represents roughly 47A output. A 40A DC-to-DC charger would limit delivered current to 40A under these assumptions. Replacing 2,000Wh at an assumed 85% average output would take roughly 4.1 hours. Real conditions vary substantially with battery acceptance, alternator heat, RPM and charging taper.

Captain’s Note — Idle is different from cruising RPM

Alternator output and cooling often fall at engine idle. An alternator-temperature sensor, charging-current controls, and checking both hot idle and cruise operation provide much better planning information than nameplate amperage.

Installation and protection checklist

  • Verify the start battery/house bank architecture and alternator regulator design.
  • Confirm DC-to-DC charger input and output operating ranges, ignition control and current limits.
  • Verify wire sizing, circuit protection, fuse interrupting ratings, isolation, and grounding.
  • Confirm battery manufacturer charge limits, BMS communication/disconnect behavior and low-temperature charging protection.
  • Follow the current applicable ABYC standards and marine equipment instructions; seek an ABYC-qualified professional for complex systems.

Marine Wire Size Calculator · Lithium Conversion Planner · Return to DC-to-DC Calculator

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.